2. Write
or tick the correct answer (one or more) from the multiple choices.
3. Duration
of the test is 30 minutes.
4. Each
question carries different marks.
Name of the
Participant: _________________________________ Location:
________________
Electrical Engineering Interview Questions
1.
What are the origins of Power Quality
Problems? (3)
(a)
Mains Power from Utility company, (b)
Mother Nature,
(c)
Human Errors, (d) Office or Industrial Internal Environment, (e) All of the
above
2.
What are the consequences of Power Quality
Problems? (3)
(a)
Loss of Business, (b) Loss of valuable
data,
(c)
Dissatisfied customers, (d) Loss of Production, (e) Financial Losses, (f) None
of the above
3.
List the Power Quality Problems (Events)
that may affect your critical load. (3)
(a)
Over-voltage, (b) Under-voltage (c) Sags/Brownout, (d)
Surges/Swells,
(e)
Voltage Spikes/Impulses/Transients, (f) EMI/RFI Noise, (g) Frequency
Variations, (h) Waveform Distortion, (i) Mains Outage/Blackouts, (j) All of the
above with different possibilities of occurrences.(h) None of above.
4.
Which are the most important interfaces
the UPS has to be compatible with? (3)
(a) UPS and
Critical Load capacity, (b) UPS and input power
source, (c) UPS and its physical environment around its installation,
(d) All of the above.
source, (c) UPS and its physical environment around its installation,
(d) All of the above.
5.
What are the generic features of UPS as a
source of power? (3)
(a)Electronically
synthesized & high quality power output, (b) Weak power source with very limited overload and short circuit
capability, (c) Can eliminate all your power problems, (d) All of the above.
6.
Which are the possible types of UPS
configurations / technologies available for protection of your critical load?
(3)
(a)
Off-line / Standby UPS, (b)
Line-interactive, (c) On-line UPS, (d) All of the above.
7.
What are the features of On-Line UPS why
it is preferred over other configuration? (3)
(a)
Provides highest level of power
conditioning and backup protection, (b) Zero switchover times during mains
outages, (c) Completely regenerated output power using double conversion
technique, (d) Provides output frequency regulation, (e) 100% effectiveness of
power protection, (f) Redundancy is possible, (g) Maintenance possible without
load shutdown.
8.
List the most important specification
parameters of an UPS? (3)
(a)
Load Capacity in kVA, (b) Load inrush
current, (c) Battery backup time, (d) Allowable input voltage range, (e) Input
current harmonics, (f) AC to AC efficiency.
9.
Draw the block schematic diagram of a UPS
system to be installed at Surma Cement (4)
10.
How many power feeders are incoming at the
UPS input? Give details. (3)
11.
What is the nominal output voltage, phase
and frequency of UPS? (3)
12.
What type of batteries are installed with
the UPS at Surma Cement? (2)
13.
How many number of Nickel Cadmium battery
cells are connected in series for
(a) 15 kVA UPS, (b) 30 kVA UPS (2)
14.
What is the float charge voltage for
batteries connected to
(a) 15 kVA UPS (b) 30 kVA UPS (2)
15.
How much is the battery back-up time with
UPS on full load? (1)
16.
How many LEDs are seen on front panel
mimic of
(a) 15 kVA UPS (b) 30 kVA UPS (2)
17.
What must be done in case the UPS shows an
audio visual Battery Discharging alarm? (2)
18.
What will happen if the batteries
discharge fully and the inverter of the UPS stops due to low DC voltage. (2)
19.
What is the maintenance required for the
Nickel Cadmium batteries installed? (2)
20.
What is the maintenance required for UPS?
(3)
21.
What is the maintenance required for the
Input Isolation Transformer cubicles? (2)
22.
What is the function of the Rectifier in
the UPS (2)
23.
What is the function of the Battery charger in the UPS (2)
24.
What is the function of the Inverter in
the UPS (2)
25.
What is the function of the Static Bypass
in the UPS (2)
26.
What is the function of the Maintenance
Bypass in the UPS (2)
27.
What will happen if a short circuit takes
place anywhere in the UPS load distribution branches? (3)
28.
How much should be the voltage between the
Earth and the UPS output Neutral terminal? (1)
29.
How much should be the voltage between the
Earth and the UPS output Line terminal? (1)
30.
Which are the most critical alarms indicated
by UPS on its front panel mimic? (3)
31.
What should be the routine log you must
maintain for the UPS installation? (3)